
Project Details
- Name:Feasibility Study and Detail Design for Construction of Dhaka—Chattogram via Cumilla/ Laksam High Speed Railway
- Category:HIGH SPEED RAILWAY PROJECT
- Author:ME CRDC Consortiums
- Client:Bangladesh Railway
- Location:Dhaka to Chattogram
- Share:
Feasibility Study and Detail Design for Construction of Dhaka—Chattogram via Cumilla/ Laksam High Speed Railway
Feasibility Study and Detail Design for Construction of Dhaka—Chattogram via Cumilla/ Laksam High Speed Railway
Feasibility Study Overview
Dhaka-Chattogram High Speed Railway has the total length of 227.3km. This feasibility study provides scientific and detailed assessment and analysis for the project implementation and decisions making, objectives of which include:
- To carry out the feasibility study for the proposed corridor and provide suggestions of alternative routes and conduct detailed analysis to recommend the most suitable alignment.
- To analyze various HSR technical standards for the proposed corridor.
- To prepare an operational plan including system and facilities related to operation and maintenance.
- To prepare the Environment Impact Assessment (EIA) for the HSR corridor based on the selected route and technical option.
- To assess qualitative and quantitative resettlement and rehabilitation.
- To conduct cost estimation and investment for implementing the proposed HSR.
- To conduct economic and financial analysis and prepare alternative financing options for the project implementation and operation.
- To prepare an implementation program based on the selected route alignment.